Resource

Managing Resource Rates

Within the System, you can enter and store a library of resource rates that you can draw on when bidding a project. When you create an estimate, you have the option of linking the bid to a particular resource file. Resource rates include labour, equipment, material and subcontracts. The system also allows you to setup a library of crews with specific production rates and of assemblies of materials.

Users can setup custom formula in order to calculate and summarize labour payroll burdens, overtime and travel costs. The same features are available to calculate equipment ownership and operating costs.

Users can setup multiple resource files in different currencies or setup multiple rates for the same resource in the same resource file. For example users can switch between internally owned, leased or rented equipment rates or switch between domestic or imported material.

 

Managing Resources

 

 

Featured Solutions

Plaxis

Plaxis is a range of finite element packages intended for 2D and 3D analysis of deformation, stability and groundwater flow in geotechnical engineering.Geotechnical applications require advanced constitutive models for the simulation ...

READMORE

Artlantis

Artlantis Studio is the fastest stand-alone 3D rendering application developed especially for architects and designers, ideal for quickly and easily creating high resolution 3D renderings, QuickTime VR Panoramas, QuickTime VR ...

READMORE

ArchiCAD

ArchiCAD gives users the ability to create great architecture and increase productivity. From day one, ArchiCAD has been designed by architects for architects, and over the years it has gradually become more and more ...

READMORE

More in: Architecture, Engineering

-
+
12